{"id":4268,"date":"2021-04-29T12:46:47","date_gmt":"2021-04-29T10:46:47","guid":{"rendered":"https:\/\/sty-x.sk\/?p=4268"},"modified":"2021-09-20T12:51:03","modified_gmt":"2021-09-20T10:51:03","slug":"the-hustle-and-the-bustle-on-construction-site","status":"publish","type":"post","link":"https:\/\/sty-x.sk\/en\/the-hustle-and-the-bustle-on-construction-site\/","title":{"rendered":"The hustle and the bustle on construction site"},"content":{"rendered":"<p>The drilling rigs have already left the construction site, the piloting is completed and step by step the building elements will begin to grow here, which will reveal the future shape of the 1st stage of the Dubi\u010dn\u00fd potok residential project. From now on, it will only grow in height. The first stage of the Dubi\u010dn\u00fd Potok project, the block D, will offer its inhabitants a wide selection of housing units, both in apartment size and number of rooms.<\/p>\n<p>And although the building is still underground, you can already browse the model apartment on the <a href=\"http:\/\/www.dubicnypotok.cz\" target=\"_blank\" rel=\"noopener noreferrer\">www.dubicnypotok.cz<\/a> website via a 3D tour: <a href=\"https:\/\/dubicnypotok.cz\/virtual-tour\/DP-cely-byt\/tour.html?fbclid=IwAR1_6fUGvlhHyHLB11XVZaPwEtkiHaHJlcb-XPuOQB9DLi1Qy8lgaOlJOB4\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/dubicnypotok.cz\/virtual-tour\/DP-cely-byt\/tour.html<\/a><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-4194\" src=\"https:\/\/sty-x.sk\/wp-content\/uploads\/2021\/04\/Bez-nazvu-1-640x427.jpg\" alt=\"\" width=\"640\" height=\"427\" srcset=\"https:\/\/sty-x.sk\/wp-content\/uploads\/2021\/04\/Bez-nazvu-1-640x427.jpg 640w, https:\/\/sty-x.sk\/wp-content\/uploads\/2021\/04\/Bez-nazvu-1-768x512.jpg 768w, https:\/\/sty-x.sk\/wp-content\/uploads\/2021\/04\/Bez-nazvu-1-320x213.jpg 320w, https:\/\/sty-x.sk\/wp-content\/uploads\/2021\/04\/Bez-nazvu-1.jpg 1200w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The drilling rigs have already left the construction site, the piloting is completed and step by step the building elements will begin to grow here, which will reveal the future shape of the 1st stage of the Dubi\u010dn\u00fd potok residential project. From now on, it will only grow in height. The first stage of the&#8230;<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[55],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/posts\/4268"}],"collection":[{"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/comments?post=4268"}],"version-history":[{"count":1,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/posts\/4268\/revisions"}],"predecessor-version":[{"id":4270,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/posts\/4268\/revisions\/4270"}],"wp:attachment":[{"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/media?parent=4268"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/categories?post=4268"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/tags?post=4268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}