{"id":4070,"date":"2020-11-24T12:41:36","date_gmt":"2020-11-24T11:41:36","guid":{"rendered":"https:\/\/sty-x.sk\/?p=4070"},"modified":"2020-12-01T10:07:12","modified_gmt":"2020-12-01T09:07:12","slug":"the-1st-stage-of-the-construction-on-dubicny-potoks-residential-project-begins","status":"publish","type":"post","link":"https:\/\/sty-x.sk\/en\/the-1st-stage-of-the-construction-on-dubicny-potoks-residential-project-begins\/","title":{"rendered":"The 1st stage of the construction on Dubi\u010dn\u00fd potok\u00b4s residential project BEGINS"},"content":{"rendered":"<p>The developer starts with the first earthworks.<\/p>\n<p>Despite the current difficult situation with compliance with pandemic measures, the fourth quarter of 2020 will be marked by preparatory construction work for the 1. Stage of the Dubi\u010dn\u00fd potok project in \u010cesk\u00e9 Bud\u011bjovice . The first block of apartment buildings, block D, will consist of 229 apartments and suites and will bring its residents a high quality of life in the form of inner blocks full of greenery, children&#8217;s and workout playgrounds, shops, cafes and underground parking.<\/p>\n<p>It is assumed that the first owners of flats should move in 1Q 2023.<\/p>\n<p><span style=\"color: #c4922b;\"><strong>Photo from preparatory works:<br \/>\n<\/strong><\/span><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-4073\" src=\"https:\/\/sty-x.sk\/wp-content\/uploads\/2020\/11\/ch01_00000000000007200_tt-640x360.jpg\" alt=\"\" width=\"640\" height=\"360\" srcset=\"https:\/\/sty-x.sk\/wp-content\/uploads\/2020\/11\/ch01_00000000000007200_tt-640x360.jpg 640w, https:\/\/sty-x.sk\/wp-content\/uploads\/2020\/11\/ch01_00000000000007200_tt-768x432.jpg 768w, https:\/\/sty-x.sk\/wp-content\/uploads\/2020\/11\/ch01_00000000000007200_tt-320x180.jpg 320w, https:\/\/sty-x.sk\/wp-content\/uploads\/2020\/11\/ch01_00000000000007200_tt.jpg 846w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The developer starts with the first earthworks. Despite the current difficult situation with compliance with pandemic measures, the fourth quarter of 2020 will be marked by preparatory construction work for the 1. Stage of the Dubi\u010dn\u00fd potok project in \u010cesk\u00e9 Bud\u011bjovice . The first block of apartment buildings, block D, will consist of 229 apartments&#8230;<\/p>\n","protected":false},"author":3,"featured_media":3696,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false},"categories":[55],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/posts\/4070"}],"collection":[{"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/comments?post=4070"}],"version-history":[{"count":3,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/posts\/4070\/revisions"}],"predecessor-version":[{"id":4079,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/posts\/4070\/revisions\/4079"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/media\/3696"}],"wp:attachment":[{"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/media?parent=4070"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/categories?post=4070"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sty-x.sk\/en\/wp-json\/wp\/v2\/tags?post=4070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}